Powering the land of rivers

Delta country of Bangladesh

Delta country of Bangladesh

Contact

Preben V. Messerschmidt

Preben V. Messerschmidt

Project Director, Biomass
T: +45 51613363

Services we provided

Bangladesh’s more than 160 million inhabitants share less electricity than Denmark’s 5.5 million, and frequent power cuts are the rule rather than the exception. Ramboll is supporting the country’s development by helping establish three major power plant units that will contribute to ensuring reliable electricity for the citizens. 

Supplying electricity to nine million citizens

Bangladesh is among the eight most populous countries in the world, and while the GNP per citizen is small in the delta country, its development aspirations are big. The country needs a sufficient and reliable power supply, and the government has set the goal of providing electricity to all citizens by 2021. Therefore, the government has entered a contract with Orion Group for the establishment of one major power plant unit in Khulna and two units in Dhaka.

Ramboll has been assisting Orion in the planning and design process, and when operational, the power plant units will produce a net capacity of 1800 MW, equivalent to the annual electricity consumption of roughly nine million Bangladeshi citizens. The three power plant units are coal based, which is rare in a European context. Still, it is the best solution under the difficult circumstances:

- In several ways, this project is ground-breaking. It’s among the first large scale coal-fired power plants in Bangladesh, and for a country that lacks sufficiently alternative resources, and where half of the population is without electricity, utilising coal is a step in the right direction. Coal is still by far the cheapest fuel available, and Ramboll is involved to make sure that the plants are designed in the most efficient way possible, says Preben Messerschmidt, Project Director in Ramboll’s Power division.

Floods, inexperience and other challenges

When compared to European standards, the construction of 630 MW power generation units in Bangladesh are challenging for a number of reasons:

- We’re working in a different culture and an inexperienced and untested society when it comes to construction of power plants of this scale. It’ll require a significant project management effort to ensure deliveries of equipment and machinery, site work quality and program compliance when we reach the manufacturing and construction phase, says Preben Messerschmidt and continues:

- Bangladesh is also known as the “Land of Rivers” and flooding during the monsoon season is disturbingly common. The plants will be built just a few metres above sea level, which requires special measures to be considered to avoid future flooding of the sites by raising the surface, dikes, layout arrangements, cooling water pump design and so on.

You will in Bangladesh also be facing an air-humidity level of 98% and an air temperature of 35°C - 40°C during summer, with a river water temperature reaching 28°C, which calls for unusual design data.

Drawing on extensive European experience

Ramboll was chosen as Project Management Contractor (PMC) on the three units to ensure technical coherence and an optimised plant design to secure the highest possible overall efficiencies of the three power plant units. The project is now progressing from conceptual design and procurement to the implementation phase, which involves detailed design review and the supervision on sites:

- The entire project is bound by a tight schedule and limited budget. We’ve assisted the owner on implementation of the overall project including post-feasibility, tendering, design specifications and procurement. Keep in mind that the project owner is simultaneously constructing three major units that all each exceed the size of even Avedøreværket in Copenhagen and without any experience of their own to lean on. Therefore, we assist in any way possible drawing on our extensive knowledge of power plant designs from projects in Europe, says Preben Messerschmidt.

As a developing country, Bangladesh is expected to benefit tremendously from the three projects as they will provide homes and industry with reliable energy.

Alstom, GE and Doosan have been selected as the preferred Original Equipment Manufacturers (OEM) for boilers and steam turbine generators.

Ramboll has assisted on the project since spring 2012, and the three power units are expected to be operational in 2018.

Ramboll

Ramboll
4245 North Fairfax Drive
Suite 700
Arlington, VA 22203
Tel:+1 703 516 2300
Fax:+1 703 516 2345

Company registration

Company registration

Ramboll USA, Inc.
4931759

Other sites

Other sites