The factory, which is the first factory on Grundfos 150,000 m2 site in Indjija, Serbia, comprises a production and warehouse building of total 18,000 m2. The factory includes built in offices, canteen, kitchen and locker rooms in two floors with a total area of 4,000 m2 as well as a separate administration building in two floors, with a total area of 1,300 m2.
Furthermore, the factory includes a combined utility, waste and storage building located north of the production building, totalling 1,700 m2. The overall area of the new factory is app. 25,000 m2. In addition to the buildings, all infrastructure on the plot is included in the project.
Services provided
Ramboll's services as general planner comprised geotechnical and environmental surveys, all design works including architectural works and construction works as well as mechanical and electrical installations and installations for the production lines. Ramboll was responsible for master plan, outline proposal, obtaining of building permits and preparation of tender documents as well as contracting.